Notice of Campus Power Shutdown

As part of the ongoing construction work for the Bracken building, power will be shut down to the following buildings on Sunday, 10/26, and Sunday, 11/2:

  • 1800
  • 1900
  • 2000
  • 2100
  • 2300

No electrical or heat will be available from 7am to 7pm on those dates. 

Students who believe this planned shutdown will impact their schoolwork or other academic activities should contact their instructor.

October 24th, 2025 by